Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
Metria / SPECIALIST SERVICES

Open and closed kitchens in Dubai

Open, enclosed, or a thoughtful balance.

Reconsider the kitchen’s connection to the living space with cooking habits, ventilation and privacy in mind. Review proposed partitions and service changes before finalising the plan.

Discuss this service
Contemporary apartment with built-in joinery, blue accents and a balcony
Apartment renovation concept · Visual direction
THE SCOPE

Define it clearly.
Deliver it thoughtfully.

Reconsider the kitchen’s connection to the living space with cooking habits, ventilation and privacy in mind. Review proposed partitions and service changes before finalising the plan. Your proposal identifies the agreed work packages, material choices and responsibilities for your specific property.

01

Open and enclosed layout options

02

Ventilation and service review

03

Partition and glazing interfaces

04

Cabinetry coordination

BEFORE DESIGN IS FINALISED

The right questions
at the right time.

How do you cook and entertain?

What services need to move?

What should be visible from the living room?

We work through these decisions using the existing property information, site conditions and your priorities. Any specialist review or approval responsibility is identified in the project proposal.

BUDGET & PROGRAMME

Start with the scope.

A useful price follows measured quantities and an agreed specification. For open and closed kitchens, the scope and installation interfaces matter as much as the visible finish.

Read our cost guidance

What shapes the proposal

  • Apartment size and rooms affected
  • Retained versus altered service positions
  • Lift, delivery and working arrangements
  • Joinery, flooring and finish level

The programme separates design, external reviews, procurement and site work. It also records the decisions needed from you before orders or installation can proceed.

CONNECTED EXPERTISE

Plan the adjoining details.

A CLOSER LOOK AT THE SCOPE

Test openness against the way the kitchen is used.

An open kitchen can connect cooking and living, while a closed or partially screened kitchen can provide a different balance of separation and flexibility. Review extraction, noise, storage, service positions and the treatment of any altered wall. The final choice should follow the household's routines and the building's actual constraints, rather than a style preference alone.

Explore the concept library
Compact apartment concept with ocean-blue storage cabinets and an open work nook.
Original design concept

Four points to carry into the brief

  • Cooking and entertaining routines
  • Extraction and equipment requirements
  • Wall and service-review responsibilities
  • Views, storage and finish continuity

From a decision to a clear appointment

Keep the agreed choices with the current drawings and specification. Identify who designs, supplies and installs each element, and how the work connects to neighbouring packages.

The proposal should also record any remaining investigations, product information and handover requirements. Resolve changes in writing so their effect on the scope and programme can be reviewed.

Review the project standards
PLANNING EXAMPLE

How the brief can develop

A household is considering opening the kitchen to the living room but values separation during cooking. Compare the daily use, sightlines, noise and storage implications of different arrangements. Have the appropriate specialists review the proposed construction and services changes. The preferred image should be tested against the actual apartment and building requirements before deciding that an open or closed layout is the right outcome.

A SCOPE YOU CAN REVIEW

What to resolve in the proposal

Request a coordinated layout with equipment, cabinet openings and the relationship to dining and living furniture. Identify the necessary technical reviews, relevant permissions and scope of making good. Compare complete options, including associated lighting, finishes and storage, rather than only the visible partition work. Record the approved arrangement before appliance or cabinetry orders depend on it.

Discuss this service
CONNECTED SCOPE

These related services often meet this scope at shared drawings, finishes, services or handover points.

YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your apartment renovation brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry