Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
Metria / Materials & makers

Chosen with intention.

A starting point for your specification conversation. Explore materials and established product makers, then select against your project’s actual requirements.

Storage that belongs to the room — design concept
Kitchen appliances

Miele

Explore the maker’s current collections and technical information. We review the selected model, dimensions, finish and installation requirements as part of the project specification.

Visit the official collection
Bathroom collections

Duravit

Explore the maker’s current collections and technical information. We review the selected model, dimensions, finish and installation requirements as part of the project specification.

Visit the official collection
Architectural surfaces

Cosentino

Explore the maker’s current collections and technical information. We review the selected model, dimensions, finish and installation requirements as part of the project specification.

Visit the official collection

Brand names identify products for consideration. They do not imply an authorised dealership, endorsement or partnership. Availability, supply, installation and manufacturer warranty terms are confirmed for the selected products.

From inspiration
to specification.

Review samples in the setting where they will be used. Consider cleaning, maintenance, exposure and the details where materials meet. Final product information should be coordinated with the drawings before purchasing or fabrication.

Discuss your material brief
THE SPECIFICATION NOTEBOOK

Choose with the whole life of the material in mind.

Compare the use, installation and care of each selected product. Samples establish a direction; the final schedule should identify the exact references, locations, quantities and responsible suppliers.

Apartment joinery concept with ribbed oak, dark stone and concealed storage.
Original design concept

Engineered timber flooring

Where it contributes
A tactile finish for suitable dry interior rooms.
Before approval
Check the full floor build-up, acoustic requirements, moisture conditions and transitions to doors and adjacent floors.
After installation
Follow the product's moisture and cleaning instructions; avoid excess water.

Porcelain flooring

Where it contributes
Durable-looking continuous surfaces and kitchen or bathroom interfaces.
Before approval
Review the substrate, tile layout, skirting, movement joints and permitted build-up.
After installation
Keep the grout and finish references with the care guide.

Made-to-measure cabinetry

Where it contributes
Storage that uses recesses, full-height walls and awkward corners.
Before approval
Allow for doors, drawers, services, ventilation and the transport route into the apartment.
After installation
Record hardware information and keep access to service panels usable.

Further product and planning research

Use current information from the relevant manufacturer or authority for the actual scope. These references do not imply a supplier partnership or endorsement.

YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your apartment renovation brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry