Direct answer: settle the air path before approving the room plan

An apartment kitchen-ventilation brief should define the cooking appliance and likely use, the capture method, whether air is exhausted or recirculated, the proposed route, discharge or connection constraints, make-up-air implications, noise expectations, access for cleaning and the approvals still required. It should also record the existing ventilation and air-conditioning arrangement rather than assuming a visible grille can serve a relocated kitchen. This work belongs early in layout design because a duct route, ceiling bulkhead, façade restriction or inaccessible filter can overturn an otherwise attractive plan. The aim is a coordinated question set for qualified designers and installers, not a do-it-yourself ventilation specification.

Describe the cooking source and expected use

Start with what produces heat, moisture, grease and odour. Record the selected or shortlisted hob type, width and manufacturer data, whether other cooking appliances contribute, and how frequently the kitchen is likely to be used. An open-plan kitchen serving daily high-heat cooking presents a different brief from a compact pantry used occasionally. Avoid converting lifestyle assumptions into unverified performance figures. Instead, give the ventilation designer the appliance information and use pattern needed to select and coordinate the system. If the appliance changes after approval, flag ventilation, electrical or gas coordination for review rather than treating the change as a simple product swap.

  • Hob type and exact model when selected
  • Cooking intensity and frequency
  • Open-plan or enclosed room
  • Other moisture or heat sources
  • Manufacturer installation and ventilation information

Survey the existing system and building constraints

Record existing extract grilles, ducts, shafts, ceiling voids, air-conditioning diffusers, access panels and nearby windows, but do not infer capacity or permission from appearance. Ask building management for the renovation rules and available as-built information, and establish whether façade penetrations, common shafts or changes to shared systems are prohibited or subject to approval. A competent professional should verify what each grille or duct actually does. The survey also needs to consider whether a revised layout could disturb air distribution in the wider apartment. Dubai Municipality’s indoor-air-quality guidance notes that renovated layouts can affect ventilation and that air distribution may require review after changes.

Compare extraction and recirculation as systems

Ducted extraction moves air toward an approved discharge point; recirculating equipment filters air and returns it to the room. Neither label alone confirms performance. Compare capture at the cooking source, route length and geometry, filter types, cleaning access, replacement consumables, noise, ceiling impact and what happens to moisture. Confirm the hood and duct requirements from the selected manufacturer and the design professional. If recirculation is proposed because a discharge route is unavailable, the brief should state that constraint openly and explain how the room’s general ventilation and moisture control will be addressed. Do not promise that odour, grease or humidity will disappear completely.

  • Capture at source
  • Approved route or return-air strategy
  • Grease and odour filtration
  • Moisture management
  • Cleaning and filter replacement access
  • Noise at realistic operating settings

Coordinate air movement, noise and maintenance

Air removed from a room must be considered as part of the apartment’s overall air movement. The responsible designer should assess make-up air, pressure relationships and interaction with air-conditioning, doors and nearby openings. At the same time, map fan position, duct support, vibration isolation and the route beside bedrooms or quiet living areas. A high headline airflow is not useful if occupants avoid the system because it is noisy or hard to clean. Provide access to filters, fans, dampers and inspection points without dismantling permanent cabinetry. Where fire, smoke or common-building systems are involved, specialist review and formal approvals may be necessary.

Planning example

Planning example: a fictional apartment owner wants to move the hob from a wall to a peninsula facing the living room. The concept drawing assumes a ceiling route to an existing grille. The survey cannot confirm that the grille is a suitable kitchen exhaust connection, while the proposed duct would cross a low beam and require a deep bulkhead. Rather than ordering cabinetry, the team records two options: retain the hob near the verified service zone, or use an appliance solution that the ventilation designer and building management accept without the assumed connection. Noise, filter access and the open-plan moisture strategy are compared before the layout is frozen. This is a planning scenario, not a completed project or approval precedent.

  • Assumed connection tested
  • Ceiling and structure constraints mapped
  • Two viable layouts compared
  • Building-management response recorded
  • Cabinet manufacture held until coordination closes

Checklist before layout approval

Attach the ventilation brief to the kitchen plan and appliance schedule. Confirm that the existing system has been identified, the proposed strategy is stated, the route or return-air arrangement is drawn and maintenance access is visible. Record building-management comments, professional calculations or selections, manufacturer requirements and any unresolved approval. Coordinate ceiling levels, lighting, sprinklers where present, cabinets, power and other services. Finally, add a commissioning and handover requirement appropriate to the approved system so the installed condition can be checked rather than assumed from the drawings.

  • Existing ventilation identified
  • Cooking appliance and use profile recorded
  • Extraction or recirculation strategy agreed
  • Noise and access reviewed
  • Building constraints and approvals tracked
  • Commissioning and maintenance information included

Limitations and next step

This framework does not size fans or ducts, authorise connections to common shafts, assess fire strategy, alter gas or electrical services, or replace current appliance and authority requirements. Conditions differ by tower and by apartment. The next step is to combine the measured kitchen plan, selected cooking appliance data, existing ventilation survey and building-management rules in one coordination review before finalising the layout. Ask the appointed professionals to confirm the compliant strategy and document any effect on the apartment’s wider air distribution.

Sources & further reading

Make this useful for your project.

A review of your property and priorities can turn general guidance into a defined brief.

Explore Open and closed kitchensDiscuss your project
Return to the journal