An original apartment renovation concept exploring how material, proportion and practical use can work together.
Original design concept · Metria Living
The brief
Practical apartment upgrades planned around space, access and building rules. This study explores a setting where daily use and a clear visual language guide the design together.
The design thinking
Metria brings a measured approach to apartment renovation. We balance the potential of your home with its real dimensions, building logistics and the practicalities of everyday city living. The concept brings that approach into a spatial idea, using a restrained material palette and clear relationships between the main elements.
From concept to your property
A visual direction is the beginning of a conversation. Translating it into a project requires measured information, a site review, specialist coordination and an agreed specification.
A good plan inside the apartment still has to fit the building’s delivery route, service positions and working arrangements.
Original design concept
Concept: high-rise home
The detail study narrows the wider brief to storage that belongs to the room. Use integrated storage, a clear kitchen connection and a calm finish palette to make the apartment work comfortably for everyday life.
Design decisions
Measure the route from loading area to apartment before sizing fabricated pieces.
Develop storage from the household inventory and door clearances.
Coordinate lighting and sockets with the furniture and cabinet layouts.
PROPOSED PROJECT TIMELINE
From the first brief to handover.
A proposed sequence for this design study. External review periods, site conditions and supplier lead times are confirmed for each commissioned project. Some stages may overlap.
Stage 1
Discovery & measured brief
Use integrated storage, a clear kitchen connection and a calm finish palette to make the apartment work comfortably for everyday life.
Review point · A scope and responsibility record
Stage 2
Design & coordinated specification
Measure the route from loading area to apartment before sizing fabricated pieces.
Review point · A reviewed drawing and specification package
Stage 3
Selections & procurement planning
Develop storage from the household inventory and door clearances.
Review point · A selection register and supply responsibilities
Stage 4
Proposed delivery sequence
Coordinate lighting and sockets with the furniture and cabinet layouts.
Review point · Staged inspections and change records
Stage 5
Review & handover planning
Review the agreed scope and record outstanding items before completion is accepted.
Review point · A snagging list, care information and agreed close-out
SPECIFICATION & QUALITY
Details that can be reviewed.
Concept palette
Light oak cabinetry
Deep blue upholstery
Pale large-format surfaces
Proposed quality records
Delivery dimensions and building arrangements
Cabinet internal elevations and hardware schedule
Protection and common-area close-out records
The concept aims for a coordinated and usable space. Performance requirements, cost and completion milestones are agreed for each commissioned project.